How to Repeat Table Headers Across Pages in Word
Open your Word document in Cue Office, click in the first row of the table, and select Table Layout → Repeat Header Rows. When the same table continues onto a new page, its column headers appear at the top.
Set the first row to repeat
Open an existing Microsoft Word document (.docx) in Cue Office. Click any cell in the table's first row, open the Table Layout tab, and click Repeat Header Rows on the right. If the button is not visible, scroll the toolbar to the right using the scrollbar below it.
Check page 2 in Print Layout
In Print Layout, scroll down to page 2. In the example, the page started with the Tablet stand row. After you turn on the setting, the four column headers appear above that row.
To change a column label, edit the first row on page 1. In the example, changing Amount to Line Total also updates the label on page 2.
Check the saved document and PDF
Save and reopen the document to confirm that page 2 still displays the header row. If you need to send a PDF, select File → Export as PDF… from the menu bar and open the exported file to verify the headers across both pages.
Update three column labels at once with Cue AI
After you turn on repeating headers, open Cue AI if you need to change several column labels at once. Specify which cells in the first row to edit.
Update three column labels in the first row of the existing equipment rental budget table: Item to Equipment, Days to Rental Days, and Unit Rate to Daily Rate. Apply the edits directly to those three cells only. Keep Line Total, all 40 equipment rows, prices, formatting, and the existing repeating header setting intact.
Review page 2 after applying the changes. In this example, the longer label Rental Days wraps onto two lines, pushing Media player onto page 2 as the table repaginates. If any items shift to the next page, check the equipment names across both pages to make sure no records were missed.
Practice with the equipment rental budget
Expand the full example
The community exhibition budget lists 40 rental items. You can copy the original text below. The two screenshots show the exported PDF with the updated column labels.
Community exhibition rental budget Riverside Arts Centre This budget helps the exhibition team confirm which equipment to reserve for the spring show. Each amount is the daily rate multiplied by the number of rental days. Item | Days | Unit Rate | Amount Display plinth | 3 | $28.00 | $84.00 Freestanding partition | 3 | $38.00 | $114.00 Gallery rail | 3 | $22.00 | $66.00 Acrylic display case | 3 | $46.00 | $138.00 Document display stand | 3 | $19.00 | $57.00 Poster frame | 3 | $12.00 | $36.00 Print browser | 3 | $24.00 | $72.00 Clip-on spotlight | 3 | $14.00 | $42.00 Track light kit | 3 | $31.00 | $93.00 Portable dimmer | 3 | $17.00 | $51.00 LED wash light | 3 | $25.00 | $75.00 Battery uplight | 3 | $22.00 | $66.00 Extension reel | 3 | $10.00 | $30.00 Cable cover | 3 | $8.00 | $24.00 Power distribution box | 3 | $25.00 | $75.00 Short-throw projector | 2 | $80.00 | $160.00 Projection screen | 2 | $37.00 | $74.00 HDMI switch | 2 | $12.00 | $24.00 Media player | 2 | $23.00 | $46.00 Tablet stand | 3 | $19.00 | $57.00 Portable speaker | 2 | $36.00 | $72.00 Handheld microphone | 2 | $25.00 | $50.00 Headphone splitter | 2 | $9.00 | $18.00 Audio tour receiver | 3 | $18.00 | $54.00 Information desk | 3 | $35.00 | $105.00 Queue stanchion | 3 | $11.00 | $33.00 Coat rack | 3 | $17.00 | $51.00 Folding chair | 3 | $6.00 | $18.00 Worktable | 3 | $22.00 | $66.00 Workshop stool | 2 | $9.00 | $18.00 Portable ramp | 3 | $47.00 | $141.00 Portable induction loop | 3 | $44.00 | $132.00 Label printer | 2 | $29.00 | $58.00 Equipment cart | 2 | $16.00 | $32.00 Protective floor mat | 3 | $13.00 | $39.00 Packing blanket | 2 | $7.00 | $14.00 Artwork transport crate | 2 | $41.00 | $82.00 Storage trolley | 2 | $18.00 | $36.00 Doorway sign stand | 3 | $12.00 | $36.00 Display mounting kit | 3 | $20.00 | $60.00
Turn the rental budget into a quote request
If a column label is too long, ask Cue AI for shorter options, then check the wrapping and page breaks in Print Layout. Once you have confirmed the equipment and rental periods, you can also ask Cue AI to draft a quote request from the table. Review each line before sending the request to suppliers.
In Cue Office, you can keep editing the Word budget (.docx), open the Excel quote sheet (.xlsx) to check prices, and export the final document as a PDF for the planning team. Cue Office offers free tools for documents, spreadsheets, and presentations.